Offshore Platform Projects

Pipeline and Piping Projects

Offshore Platform Projects

F18 PLATFORM OF FOROOZAN FIELD BASIC AND DETAIL ENGINEERING

Client: IGC / IOOC

Location: Foroozan Field

Date of Contract: 2012

IRANINAN offshore oil company (I.O.O.C) intends to further develop the FOROOZAN fields through execution of the FOROOZAN new F18 wellhead platform project.

The NEW foroozan F18 wellhead platform project foresees the construction of one new platform at or near the existing foroozan complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50 m.

The F18 platform will be installed in a location about 2100m from existing FX platform in the FOROOZAN complex. The FOROOZAN complex is located in Iran and Saudi Arabia border, 110 KM from KHARG Island.

Farazan Saze Darya (FARDA) Co. has done structural Engineering of Basic and Detai.

S1 PLATFORM OF SALMAN FIELD BASIC AND DETAIL ENGINEERING

Client: Asfalt Tous / IOOC

Location: Salman Field

Date of Contract: 2013

This project involves work in two locations; new facilities in satellite wellhead platform, S1,over the Salman reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities. Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144 km south of Lavan Island.

This field straddles the Iran – Abu Dhabi border with approximately two-thirds of the producing structure lying in Iranian waters. The existing offshore facility at the Salman oil and gas field has been producing since 1968. The extracted crude oil is processed and exported via a subsea pipeline to onshore facilities at Lavan Island.

The project scope includes:

  • Offshore platform and facilities,S1
  • Production and test lines from S1 satellite platform to existing Salman Complex
  • Gas lift line from existing Salman Complex to new S1 satellite platform
  • Subsea cabling between existing Salman Complex and S1 satellite platform
  • Tie-ins to existing offshore facilities
  • Bridge between PP3 and PP2

Farazan Saze Darya (FARDA) Co. has done structural Engineering of Basic and Detail.

SPOL TOPSIDE INSTALLATION ENGINEERING

Client: SADAF / Petro Iran / POGC

Location: South Pars Field

Date of Contract: 2011

SPOL is an oil platform in south pars oil layer, this topside constructed in SAFF yard, SAFF Co. was EPCI contractor for this project, and SADAF was responsible for Installation. Installation Engineering has done by FARDA Co.

SPOL Topside will install with lift method and with use heavy lifting vessel SADAF3000.

F18 JACKET INSTALLATION ENGINEERING

Client: IGC / IOOC

Location: Foroozan Field

Date of Contract: 2012

The NEW FOROOZAN F18 wellhead platform project foresees the construction of one new platform at or near the existing FOROOZAN complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50m.

F18 platform initially was a four legged batter structure but due to installation difficulty in lift operation it changed to a jacket with single batter in one row and no batter for the other row. Piles (1524 mm) will be driven through legs.

Jacket should installation whit lift method the weight of jacket is about 1000 ton.

FarazanSaze Darya (FARDA) Co. has doneF18 Jacket Installation Engineering.

SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 12

Client: SADAF / SEPEHR-ROSEMOND / Petro Pars

Location: South Pars Field

Date of Contract: 2013

Petro pars Ltd (COMPANY) intends to develop new facilities in the Persian Gulf from Phase 12 of the South Pars Gas field development called SPD12E.

The objective of Phase 12 of the South Pars Gas field development project is to produce gas and condensate for export. The offshore section is located some 100 km offshore south west of Assaluye in the Persian Gulf and the onshore gas treatment plant located in the Tombak area. Facilities on the unmanned platform are mainly for fluid gathering, well testing, condensed and free water separation and oily water treatment.

Reservoir fluids are transferred to Tombak onshore gas plant via dedicated sea lines and then treated to produce the following main products:

  • Sour wet gas as feed stock for NIOC LNG plant
  • Treated sweet gas for the main national IGAT6 trunk line
  • Treated LPG for export
  • Stabilized hydrocarbon condensate for export by marine tankers

Petropars Ltd (COMPANY) has awarded an EPCF project to SEPEHR-ROSEMOND for one wellhead jacket (SPD12E) in Phase 12 of the South Pars Gas field.

Farazan Saze Darya (FARDA) Co. has done SPD12E Jacket Installation Engineering.

CONSTRUCTION ENGINEERING OF S1 JACKET

Client: Asfalt Tous / IOOC

Location: Salman Field

Date of Contract: 2013

This project involves work in two locations; new facilities in satellite wellhead platform, S1, over the Salman reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities.

Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144 km south of Lavan Island. This field straddles the Iran – Abu Dhabi border with approximately two-thirds of the producing structure lying in Iranian waters.

The existing offshore facility at the Salman oil and gas field has been producing since 1968. The extracted crude oil is processed and exported via a subsea pipeline to onshore facilities at Lavan Island.

S1 Jacket weight is about 400 ton.

Farazan Saze Darya (FARDA) Co. has done Jacket construction Engineering.

SOROOSH FSU PILES DESIGN & INSTALLATION ENGINEERING

Client: SADAF / IOOC

Location: Soroosh Field

Date of Contract: 2012

Iranian Offshore Oil COMPANY making a floating tanker to name FSU for installed in the field. Float is the largest floating in the Persian Gulf.

The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU.

The FSU model includes the external surface of the vessel hull in addition to the ballasting tanks (interior compartments) and the mooring system. Compartments are modeled for considering FSU draft.

FarazanSaze Darya (FARDA) Co. has done FSU Piles Design & Installation Engineering.

F18 FOROOZAN TOPSIDE INSTALATION ENGINEERING

Client: IGC / IOOC

Location: Foroozan Field

Date of Contract: 2012

The topside is supported on four points on tubular stubs. These stubs have actually been modeled in SACS with appropriate joint releases to simulate simply supported condition. This topside construction in Pars Faragam Qeshm Yard, Iran International General Contractor “IGC” was EPCI Contractor in this project, and was responsible for installation.

Topside was installed with lift methodthe weight of topside is about 1000 ton.

FarazanSaze Darya (FARDA) Co. has done F18 topside Installation Engineering.

SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 15 AND 16 OFFSHORE PLATFORM

Client: SADAF / NIOC

Location: South Pars Field

Date of Contract: 2014

South Pars Gas Field is located offshore about 100 km South West of Assaluyeh, Persian Gulf, Iran. NIOC intends to develop South Pars Gas Field phases 15 and 16. POGC has been selected for the development of entire field. They have given a contract to IOEC/ ISOICO/ SAFF for the offshore portion. IOEC is the pipeline and offshore installation contractor. ISOICO is phase 16 EPC Contractor and SAFF is phase 15 EPC Contractor. Basic/ FEED has been performed by Aker Kvaerner and detail design is to be done by SLTE.

The offshore development of phases 15 and 16 consists of two wellhead platforms SPD15 and SPD16. Each phase has one wellhead platform, one intermediate support platform bridge connected to the flare platform. Each wellhead platform has 15 slots. Produced gas is routed via 32 inch pipeline to onshore facilities in Assaluyeh. Gas export line is accompanied with a 4 inch MEG line.

Wellhead platforms are unmanned with a small facility for crew which may happen to spend the night. Power generation is by two generating sets. Fiber optic subsea cable takes the control signals to the nearby phases 2/3 platforms. From there it is routed to phase 15 and 16 Onshore Plant and also to SPQ1 central control room.

SOROOSH FSU ANCHOR PILES RECTIFICATION

Client: SADAF / IOOC

Location: Soroosh Field

Date of Contract: 2012

Regarding to geotechnical report FSU anchor piles could penetration until 32m below mud line. Bat in operation all piles refused on about 22m below mud line.

Farazan Saze Darya (FARDA) Co. has done prepared a new method for rectification of piles. This method Was the first method of rectification in Iran & all Engineering have done by FARDA Co

Pipeline and Piping Projects

BAHREGANSAR SUBSEA PIPELINE INSTALLATION ENGINEERING PROJECT

Client: SADAF / IOOC

Location: Bahregansar Field

Date of Contract: 2011

Bahregansar offshore oil field is located in south Iran, approximately 15 kilometers from the shoreline in the northern part of the Persian Gulf.

There are 4 wellhead platforms named WHP4, WHP5, WHP6, WHP7, 1 multi wellhead platform named MWP and a manifold platform MP amongst all installations in the oil field that are of interest of the present project. It is intended that wellhead platforms are connected to the manifold platform via new pipelines. Details of these new pipelines are as follows:

  • Two 6” pipeline connecting WHP4 to MP platform, 1.02 km distance between two platforms.
  • One 6” pipeline connecting WHP5 to MP platform, 2.26 km distance between two platforms.
  • One 6” pipeline connecting WHP6 to MP platform, 1.16 km distance between two platforms.
  • One 6” pipeline connecting WHP7 to MP platform, 0.55 km distance between two platforms.
  • One 8” pipeline connecting MWP to MP platform, 1.62 km distance between two platforms.

The scope of work for the Bahregansar Sub Sea Pipeline Project is described hereafter. The package comprises the detailed design, survey work, material procurement, fabrication, and installation, and tie-in, strength testing of a.m. pipelines and J-Tubes and all accessories.

Farazan Saze Darya (FARDA) Co. has done Pipeline installation Engineering.

SOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE INSTALLATION ENGINEERING

Client: SADAF / IOOC

Location: Soroosh Field

Date of Contract: 2013

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project. The Soroosh&Nowrooz fields are located in The Persian Gulf. Soroosh field is located approximately 80 kilometers south-west of Kharg Island and Nowrooz field is located approximately 50 km to the north of the Soroosh field, approximately 100 kilometers west of Kharg Island (Iran). The Soroosh&Nowrooz integrated development project consists of seven new platforms, associated utilities and five new offshore pipelines. The pipeline network consists of two multiphase flow lines, two oil export pipelines and an inter-field emulsion pipeline.

The Soroosh wellheads are located on two wellhead platforms. SWP-1 is bridge linked to the Soroosh complex while the SWP-2 platform is located 4 km to the south of Soroosh complex. The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU. The Soroosh crude is processed on the SPP-1 platform. Nowrooz crude is treated on the SPP-2 platform. The Soroosh complex has a dedicated living quarter’s platform (SLQ).

The Nowrooz field consists of a platform complex, which includes living quarters (NLQ) and a wellhead platform (NWP-1). Nowrooz crude is partially treated at the NPP-2 processing platform and exported as an oil/water emulsion to the Soroosh SPP-2 platform 50 km to the south. The NPP-2 platform has been extended to accommodate additional wellheads.

FarazanSaze Darya (FARDA) Co. has done Pipeline installation Engineering.

PLEM DETAILED & INSTALLATION ENGINEERING (Soroosh Field)

Client: SADAF / IOOC

Location: Soroosh Field

Date of Contract: 2012

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project. The Soroosh&Nowrooz fields are located in The Persian Gulf. Soroosh field is located approximately 80 kilometers south-west of Kharg Island. Plem is a structure, this structure acts as a conversion to liquid pipelines.Plem of soroosh with dimension of 26 & 24 m is as built Iran for first time.

Farazan Saze Darya (FARDA) Co. has done sorooshplem detail design &installation Engineering.

Detail design performed previously by other company but in this time FARDA CO. has dane detailed design again.

SOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE DETAILED DESIGN

Client: SADAF / IOOC

Location: Soroosh Field

Date of Contract: 2012

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Sorooshfields through execution of the Soroosh Renovation and Development project.

Soroosh field is located approximately 80 kilometers south-west of Kharg Island. Iranian Offshore Oil COMPANY making a floating tanker to name FSU for installed in the field. Float is the largest floating in the Persian Gulf. The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU.

FarazanSaze Darya (FARDA) Co. has done Pipeline Detailed Design.

But for changing in riser location detailed design has done by FARDA CO.