• slide0_1
  • slide0_2
  • slide0_3
  • slide0_4

Project services

  • Marine Spreads inspection
  • Scheduling sea and dry repairmen
  • Construction Supporting
  • Installation Supporting

Purchase Engineering Services

  • Purchase engineering services
  • Material management
  • Procurement services

Engineering Services

  • Basic and Detail engineering services
  • Risk engineering services
  • Contract
  • Project control and scheduling

Latest Projects

F18 PLATFORM OF FOROOZAN FIELD BASIC AND DETAIL ENGINEERING

Client: IGC / IOOC

Date of Contract: 2012

Location: Foroozan Field

IRANINAN offshore oil company (I.O.O.C) intends to further develop the FOROOZAN fields through execution of the FOROOZAN new F18 wellhead platform project.

The NEW foroozan F18 wellhead platform project foresees the construction of one new platform at or near the existing foroozan complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50 m.

More

S1 PLATFORM OF SALMAN FIELD BASIC AND DETAIL ENGINEERING

Client: Asfalt Tous / IOOC

Date of Contract: 2013

Location: Salman Field

This project involves work in two locations; new facilities in satellite wellhead platform, S1,over the Salman reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities. Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144 km south of Lavan Island.

More

SPOL TOPSIDE INSTALLATION ENGINEERING

Client: SADAF / Petro Iran / POGC

Date of Contract: 2011

Location: South Pars Field

SPOL is an oil platform in south pars oil layer, this topside constructed in SAFF yard, SAFF Co. was EPCI contractor for this project, and SADAF was responsible for Installation. Installation Engineering has done by FARDA Co.

More

F18 JACKET INSTALLATION ENGINEERING

Client: IGC / IOOC

Date of Contract: 2012

Location: Foroozan Field

The NEW FOROOZAN F18 wellhead platform project foresees the construction of one new platform at or near the existing FOROOZAN complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50m.

F18 platform initially was a four legged batter structure but due to installation difficulty in lift operation it changed to a jacket with single batter in one row and no batter for the other row. Piles (1524 mm) will be driven through legs.

More

SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 12

Client: SADAF / SEPEHR-ROSEMOND / Petro Pars

Date of Contract: 2013

Location: South Pars Field

Petro pars Ltd (COMPANY) intends to develop new facilities in the Persian Gulf from Phase 12 of the South Pars Gas field development called SPD12E.

The objective of Phase 12 of the South Pars Gas field development project is to produce gas and condensate for export. The offshore section is located some 100 km offshore south west of Assaluye in the Persian Gulf and the onshore gas treatment plant located in the Tombak area. Facilities on the unmanned platform are mainly for fluid gathering, well testing, condensed and free water separation and oily water treatment.

More

CONSTRUCTION ENGINEERING OF S1 JACKET

Client: Asfalt Tous / IOOC

Date of Contract: 2013

Location: Salman Field

This project involves work in two locations; new facilities in satellite wellhead platform, S1, over the Salman reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities.

Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144 km south of Lavan Island. This field straddles the Iran – Abu Dhabi border with approximately two-thirds of the producing structure lying in Iranian waters.

More

SOROOSH FSU PILES DESIGN & INSTALLATION ENGINEERING

Client: SADAF / IOOC

Date of Contract: 2012

Location: Soroosh Field

Iranian Offshore Oil COMPANY making a floating tanker to name FSU for installed in the field. Float is the largest floating in the Persian Gulf.

The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU.

More

F18 FOROOZAN TOPSIDE INSTALATION ENGINEERING

Client: IGC / IOOC

Date of Contract: 2012

Location: Foroozan Field

South Pars Gas Field is located offshore about 100 km South West of Assaluyeh, Persian Gulf, Iran. NIOC intends to develop South Pars Gas Field phases 15 and 16. POGC has been selected for the development of entire field. They have given a contract to IOEC/ ISOICO/ SAFF for the offshore portion. IOEC is the pipeline and offshore installation contractor. ISOICO is phase 16 EPC Contractor and SAFF is phase 15 EPC Contractor. Basic/ FEED has been performed by Aker Kvaerner and detail design is to be done by SLTE.

More

SOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 15 AND 16 OFFSHORE PLATFORM

Client: SADAF / NIOC

Date of Contract: 2014

Location: South Pars Field

South Pars Gas Field is located offshore about 100 km South West of Assaluyeh, Persian Gulf, Iran. NIOC intends to develop South Pars Gas Field phases 15 and 16. POGC has been selected for the development of entire field. They have given a contract to IOEC/ ISOICO/ SAFF for the offshore portion. IOEC is the pipeline and offshore installation contractor. ISOICO is phase 16 EPC Contractor and SAFF is phase 15 EPC Contractor. Basic/ FEED has been performed by Aker Kvaerner and detail design is to be done by SLTE.

More

SOROOSH FSU ANCHOR PILES RECTIFICATION

Client: SADAF / NIOC

Date of Contract: 2014

Location: Soroosh Field

Regarding to geotechnical report FSU anchor piles could penetration until 32m below mud line. Bat in operation all piles refused on about 22m below mud line.

Farazan Saze Darya (FARDA) Co. has done prepared a new method for rectification of piles. This method Was the first method of rectification in Iran & all Engineering have done by FARDA Co

> More

BAHREGANSAR SUBSEA PIPELINE INSTALLATION ENGINEERING PROJECT

Client: SADAF / IOOC

Date of Contract: 2011

Location: Bahregansar Field

Bahregansar offshore oil field is located in south Iran, approximately 15 kilometers from the shoreline in the northern part of the Persian Gulf.

There are 4 wellhead platforms named WHP4, WHP5, WHP6, WHP7, 1 multi wellhead platform named MWP and a manifold platform MP amongst all installations in the oil field that are of interest of the present project. It is intended that wellhead platforms are connected to the manifold platform via new pipelines.

More

SOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE INSTALLATION ENGINEERING

Client: SADAF / IOOC

Date of Contract: 2013

Location: Soroosh Field

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project. The Soroosh&Nowrooz fields are located in The Persian Gulf. Soroosh field is located approximately 80 kilometers south-west of Kharg Island and Nowrooz field is located approximately 50 km to the north of the Soroosh field, approximately 100 kilometers west of Kharg Island (Iran). The Soroosh&Nowrooz integrated development project consists of seven new platforms, associated utilities and five new offshore pipelines. The pipeline network consists of two multiphase flow lines, two oil export pipelines and an inter-field emulsion pipeline.

More

PLEM DETAILED & INSTALLATION ENGINEERING (Soroosh Field)

Client: SADAF / IOOC

Date of Contract: 2012

Location: Soroosh Field

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project. The Soroosh&Nowrooz fields are located in The Persian Gulf. Soroosh field is located approximately 80 kilometers south-west of Kharg Island. Plem is a structure, this structure acts as a conversion to liquid pipelines.Plem of soroosh with dimension of 26 & 24 m is as built Iran for first time.

Farazan Saze Darya (FARDA) Co. has done sorooshplem detail design &installation Engineering.

More

SOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE DETAILED DESIGN

Client: SADAF / IOOC

Date of Contract: 2012

Location: Soroosh Field

Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Sorooshfields through execution of the Soroosh Renovation and Development project.

Soroosh field is located approximately 80 kilometers south-west of Kharg Island. Iranian Offshore Oil COMPANY making a floating tanker to name FSU for installed in the field. Float is the largest floating in the Persian Gulf. The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU.

More