Project services
Purchase Engineering Services
Engineering Services
Latest Projects
F18 PLATFORM OF FOROOZAN FIELD BASIC AND DETAIL ENGINEERING
Client: IGC / IOOC
Date of Contract: 2012
Location: Foroozan Field
IRANINAN offshore oil company (I.O.O.C) intends to further develop the FOROOZAN fields through execution of the FOROOZAN new F18 wellhead platform project.
The NEW foroozan F18 wellhead platform project foresees the construction of one new platform at or near the existing foroozan complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50 m.
MoreS1 PLATFORM OF SALMAN FIELD BASIC AND DETAIL ENGINEERING
Client: Asfalt Tous / IOOC
Date of Contract: 2013
Location: Salman Field
This project involves work in two locations; new facilities in satellite wellhead platform, S1,over the Salman reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities. Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144 km south of Lavan Island.
MoreSPOL TOPSIDE INSTALLATION ENGINEERING
Client: SADAF / Petro Iran / POGC
Date of Contract: 2011
Location: South Pars Field
SPOL is an oil platform in south pars oil layer, this topside constructed in SAFF yard, SAFF Co. was EPCI contractor for this project, and SADAF was responsible for Installation. Installation Engineering has done by FARDA Co.
MoreF18 JACKET INSTALLATION ENGINEERING
Client: IGC / IOOC
Date of Contract: 2012
Location: Foroozan Field
The NEW FOROOZAN F18 wellhead platform project foresees the construction of one new platform at or near the existing FOROOZAN complex together with infield pipelines & submarine cables and Necessary extension of existing of FX platform. Water depth ranges about 50m.
F18 platform initially was a four legged batter structure but due to installation difficulty in lift operation it changed to a jacket with single batter in one row and no batter for the other row. Piles (1524 mm) will be driven through legs.
MoreSOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 12
Client: SADAF / SEPEHR-ROSEMOND / Petro Pars
Date of Contract: 2013
Location: South Pars Field
Petro pars Ltd (COMPANY) intends to develop new facilities in the Persian Gulf from Phase 12 of the South Pars Gas field development called SPD12E.
The objective of Phase 12 of the South Pars Gas field development project is to produce gas and condensate for export. The offshore section is located some 100 km offshore south west of Assaluye in the Persian Gulf and the onshore gas treatment plant located in the Tombak area. Facilities on the unmanned platform are mainly for fluid gathering, well testing, condensed and free water separation and oily water treatment.
MoreCONSTRUCTION ENGINEERING OF S1 JACKET
Client: Asfalt Tous / IOOC
Date of Contract: 2013
Location: Salman Field
This project involves work in two locations; new facilities in satellite wellhead platform, S1, over the Salman reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities.
Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144 km south of Lavan Island. This field straddles the Iran – Abu Dhabi border with approximately two-thirds of the producing structure lying in Iranian waters.
MoreSOROOSH FSU PILES DESIGN & INSTALLATION ENGINEERING
Client: SADAF / IOOC
Date of Contract: 2012
Location: Soroosh Field
Iranian Offshore Oil COMPANY making a floating tanker to name FSU for installed in the field. Float is the largest floating in the Persian Gulf.
The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU.
MoreF18 FOROOZAN TOPSIDE INSTALATION ENGINEERING
Client: IGC / IOOC
Date of Contract: 2012
Location: Foroozan Field
South Pars Gas Field is located offshore about 100 km South West of Assaluyeh, Persian Gulf, Iran. NIOC intends to develop South Pars Gas Field phases 15 and 16. POGC has been selected for the development of entire field. They have given a contract to IOEC/ ISOICO/ SAFF for the offshore portion. IOEC is the pipeline and offshore installation contractor. ISOICO is phase 16 EPC Contractor and SAFF is phase 15 EPC Contractor. Basic/ FEED has been performed by Aker Kvaerner and detail design is to be done by SLTE.
MoreSOUTH PARS GAS FIELD DEVELOPMENT PROJECT PHASE 15 AND 16 OFFSHORE PLATFORM
Client: SADAF / NIOC
Date of Contract: 2014
Location: South Pars Field
South Pars Gas Field is located offshore about 100 km South West of Assaluyeh, Persian Gulf, Iran. NIOC intends to develop South Pars Gas Field phases 15 and 16. POGC has been selected for the development of entire field. They have given a contract to IOEC/ ISOICO/ SAFF for the offshore portion. IOEC is the pipeline and offshore installation contractor. ISOICO is phase 16 EPC Contractor and SAFF is phase 15 EPC Contractor. Basic/ FEED has been performed by Aker Kvaerner and detail design is to be done by SLTE.
MoreSOROOSH FSU ANCHOR PILES RECTIFICATION
Client: SADAF / NIOC
Date of Contract: 2014
Location: Soroosh Field
Regarding to geotechnical report FSU anchor piles could penetration until 32m below mud line. Bat in operation all piles refused on about 22m below mud line.
Farazan Saze Darya (FARDA) Co. has done prepared a new method for rectification of piles. This method Was the first method of rectification in Iran & all Engineering have done by FARDA Co
> MoreBAHREGANSAR SUBSEA PIPELINE INSTALLATION ENGINEERING PROJECT
Client: SADAF / IOOC
Date of Contract: 2011
Location: Bahregansar Field
Bahregansar offshore oil field is located in south Iran, approximately 15 kilometers from the shoreline in the northern part of the Persian Gulf.
There are 4 wellhead platforms named WHP4, WHP5, WHP6, WHP7, 1 multi wellhead platform named MWP and a manifold platform MP amongst all installations in the oil field that are of interest of the present project. It is intended that wellhead platforms are connected to the manifold platform via new pipelines.
MoreSOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE INSTALLATION ENGINEERING
Client: SADAF / IOOC
Date of Contract: 2013
Location: Soroosh Field
Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project. The Soroosh&Nowrooz fields are located in The Persian Gulf. Soroosh field is located approximately 80 kilometers south-west of Kharg Island and Nowrooz field is located approximately 50 km to the north of the Soroosh field, approximately 100 kilometers west of Kharg Island (Iran). The Soroosh&Nowrooz integrated development project consists of seven new platforms, associated utilities and five new offshore pipelines. The pipeline network consists of two multiphase flow lines, two oil export pipelines and an inter-field emulsion pipeline.
MorePLEM DETAILED & INSTALLATION ENGINEERING (Soroosh Field)
Client: SADAF / IOOC
Date of Contract: 2012
Location: Soroosh Field
Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Soroosh and Nowrooz fields through execution of the Soroosh Renovation and Development project. The Soroosh&Nowrooz fields are located in The Persian Gulf. Soroosh field is located approximately 80 kilometers south-west of Kharg Island. Plem is a structure, this structure acts as a conversion to liquid pipelines.Plem of soroosh with dimension of 26 & 24 m is as built Iran for first time.
Farazan Saze Darya (FARDA) Co. has done sorooshplem detail design &installation Engineering.
MoreSOROOSH RENOVATION AND DEVELOPMENT PROJECT, PIPELINE DETAILED DESIGN
Client: SADAF / IOOC
Date of Contract: 2012
Location: Soroosh Field
Iranian Offshore Oil COMPANY (IOOC) intends to renovate and further develop the Sorooshfields through execution of the Soroosh Renovation and Development project.
Soroosh field is located approximately 80 kilometers south-west of Kharg Island. Iranian Offshore Oil COMPANY making a floating tanker to name FSU for installed in the field. Float is the largest floating in the Persian Gulf. The processing facilities for the Soroosh field are located on the SPP-1 and SPP-2 platforms in the Soroosh Complex. The facilities on these platforms carry out crude treatment to tanker export specification, prior to transfer to the FSU.
More